Menu Close

Documents

100% Documents

Preliminary Design Program (PDP)

Preferred Schematic Report (PSR)

Schematic Design (SD)

Project Scope and Budget Agreement (PS&B)

Project Funding Agreement (PFA)

Design Development

6A.0.0 Cover

6A.1.1 Basic Project Information

6A.2.1 OPM Submittal

6A.2.2 Project Schedule

6A.2.3 Project Budget

6A.3.1 General Requirements

6A.3.2 Space Summary

6A.3.3 Project Approvals

6A.3.5 DD Drawings

6A.3.6 DD Project Manual

6A.3.7 DD Project Coordination

60% Construction Documents

90% Construction Documents