NEMT Response to MSBA – Melrose ADA Letter – January 16, 2023
April 10, 2019: Northeast Metro Tech MSBA Invitation to Feasibility Study Phase
2025-02-13 NEMT SBC Presentation Slides
100% Documents
Preliminary Design Program (PDP)
2020.08.14 NEMT PMA PDP Cover Letter FINAL
3.1.0 - Cover
3.1.0 - Cover Letter - MSBA PDP Submission
3.1.0 - TOC
3.1.1 - Introduction
3.1.1a - Project Directory
3.1.1b - Updated Project Schedule
3.1.2 - Educational Program
3.1.3 - Initial Space Summary
3.1.4a - Evaluation of Existing Conditions
3.1.4b - Space Analysis Plans
3.1.4c - Evidence of Legal Title
3.1.4d - Base Repair - Budget Cost Estimate
3.1.4e - Base Repair - Prelim Arch Scope Diagrams
3.1.5 - Site Development Requirements
3.1.6 - Prelim Eval of Alternatives
3.1.7 - Local Actions & Approval Cert
Appendix A - Modified Space Summary
Appendix B - Cover
Appendix B (a) - Existing Conditions Report - Landscape
Appendix B (b) - Existing Conditions Report - Civil
Appendix B (c) - Existing Conditions Report - Architectural
Appendix B (d) - Existing Conditions Report - Accessibility
Appendix B (e) - Existing Conditions Report - Furniture & Equipment
Appendix B (f) - Existing Conditions Report - Building Code
Appendix B (g) - Existing Conditions Report - Structural
Appendix B (h) - Existing Conditions Report - MEP-FP -
Appendix B (i) - Existing Conditions Report - Technology
Appendix B (j) - Existing Conditions Report - Hazardous Materials
Appendix B (k) - Existing Conditions Report - Traffic Assessment Report
Appendix C - Educational Visioning Report
Appendix D - Phase I Enviro Site Assessment
Appendix E - Wetland Resource Area Anaylsis Report
Appendix F - Statement of Interest
Appendix G - MSBA Board Action Letter
Appendix H - Geotechnical
Appendix I - Cover
Appendix I (a) - Enrollment Certification
Preferred Schematic Report (PSR)
3.3.0 - Cover Letter - MSBA PDP Submission
3.3.0 - Cover
3.3.0 - TOC
3.3.1 - Introduction
3.3.2 - Evaluation of Existing Conditions
3.3.3 - Final Evaluation of Alternatives - Narrative
3.3.3 (a) - Option B.2 Drawings
3.3.3 (b) - Option C.1 Drawings
3.3.3 (c) - Option C.2 Drawings
3.3.3 (d) - Option C.3 Drawings
3.3.3 (e) - Permitting Requirements
3.3.3 (f) - Construction Phasing Diagrams
3.3.3 (g) - Electric Loads
3.3.3 (h) - Gas Loads
3.3.4 - Preferred Solution - Narrative
3.3.4 (a) - Updated Educational Program
3.3.4 (b) - Preferred Solution Space Summary
3.3.4 (c) - Sustainability Documents
3.3.4 (d) - Building Plans
3.3.4 (e) - Site Plan
3.3.4 (f) - Updated Project Schedule
3.3.4 (g) - District's Budget Statement for Preferred Solution
3.3.5 - Local Actions & Approvals
Appendix A - Consultant Narratives - Cover
Appendix A (a) - Consultant Narratives - Landscape
Appendix A (b) - Consultant Narratives - Civil
Appendix A (c) - Consultant Narratives - Architectural
Appendix A (d) - Consultant Narratives - FFE
Appendix A (e) - Consultant Narratives - Structural
Appendix A (f) - Consultant Narratives - MEP-FP
Appendix A (g) - Consultant Narratives - Technology
Appendix A (h) - Consultant Narratives - Traffic
Appendix A (i) - Consultant Narratives - Geotechnical
Appendix B - Cover
Appendix B (a) - Cost Estimate - Arch
Appendix B (b) - Cost Estimate - OPM
Appendix B (c) - Cost Estimate - FFE
Appendix B (d) - Cost Estimate - Technology
Appendix C - Preferred Solution Space Summary
Appendix D - Response to MSBA PDP Review
Appendix E - Education Program w Highlighted Changes
Schematic Design (SD)
Schematic Design Binder
4.1.2-01_Introduction Narrative
4.1.2-01a_MSBA Board of Director's Visual Aids
4.1.2-01b_Response to MSBA PSR Review
4.1.2-02_Final Design Program
4.1.2-02a_Education Space Summary w Narrative
4.1.2-02b_Space Summary Analysis w Designer Cert
4.1.2-02c_Construction Phasing
4.1.2-02d_Fire Department Meeting Minutes
4.1.2-03_Traffic Analysis
4.1.2-04_Enviro & Exist Build Assess
4.1.2-05_Geotechnical Analysis
4.1.2-06_Code Analysis
4.1.2-07_Utility Analysis-Cover
4.1.2-07a_Gas Service
4.1.2-07b_Flow Test
4.1.2-07c_Electrical Service
4.1.2-08_Massing Study
4.1.2-09_Building Systems Narrative - Cover
4.1.2-09a_Civil Narrative
4.1.2-09b_Site Narrative
4.1.2-09c_Architectural Narrative
4.1.2-09d_MEP-FP Narratives
4.1.2-09e_Structural Narrative
4.1.2-09f_FFE Narrative
4.1.2-09g_Technology & Security Narrative
4.1.2-10_Sustainable Design
4.1.2-11_ADA-MAAB Analysis
4.1.2-12_Room Data Sheets
4.1.2-13_Proposed Construction Methodology
4.1.2-14_District Anticipated Reimburse Rate
4.1.2-15_Total Project Budget
4.1.2-15a_Total Project Budget Spreadsheet
4.1.2-15b_Furniture & Equipment Budget
4.1.2-15c_Technology FFE Budget
4.1.2-15d_Estimated Local Share - Tax Impact
4.1.2-16_Cost Estimator - Designer
4.1.2-17_Cost Estimator - CMR
4.1.2-18_Updated Project Work Plan - Cover
4.1.2-18a_Project Directory
4.1.2-18b_Comm-Doc Control Procedure
4.1.2-18c_Designer Work Plan
4.1.2-18d_Project Schedule
4.1.2-19_Local Actions & Approvals
Schematic Design Drawings
NEMetroTech - Schematic Design - [00] Cover
NEMetroTech - Schematic Design - [01] Civil
NEMetroTech - Schematic Design - [02] Traffic
NEMetroTech - Schematic Design - [03] Landscape
NEMetroTech - Schematic Design - [04] Architectural
NEMetroTech - Schematic Design - [05] Equipment
NEMetroTech - Schematic Design - [06] Structural
NEMetroTech - Schematic Design - [07] Fire Protection
NEMetroTech - Schematic Design - [08] Plumbing
NEMetroTech - Schematic Design - [09] Mechanical
Design Development
6A.3.1 General Requirements
6A.3.1-02 Basis of Design Narratives
6A.3.1-03 Building Code Analysis
6A.3.1-05 Interior Color Theory Statement
6A.3.1-07 Structural Load Calculations
6A.3.1-08 Energy Model Calculations
6A.3.1-09 Life Cycle Cost Analysis
6A.3.1-10 HVAC Heat Gain-Loss Calculations
6A.3.1-11 Electrical Load Calculations
6A.3.1-12 Security & Visual Access
6A.3.1-13 Facility Maintenance Requirements
6A.3.5 DD Drawings
6A.3.5 Design Development Drawings
NEMetroTech - DD Drawings - [00] Cover-TOC
NEMetroTech - DD Drawings - [01] Civil
NEMetroTech - DD Drawings - [02] Traffic
NEMetroTech - DD Drawings - [03] Landscape
NEMetroTech - DD Drawings - [04a] Architectural
NEMetroTech - DD Drawings - [04b] Architectural Finishes
NEMetroTech - DD Drawings - [05] Equipment
NEMetroTech - DD Drawings - [06] Theatre
NEMetroTech - DD Drawings - [07] Food Service
NEMetroTech - DD Drawings - [08] Structure
NEMetroTech - DD Drawings - [09] GeoTech
NEMetroTech - DD Drawings - [10] Plumbing
NEMetroTech - DD Drawings - [11] Fire Protection
NEMetroTech - DD Drawings - [12] Mechanical
NEMetroTech - DD Drawings - [13] Lighting
NEMetroTech - DD Drawings - [14] Fire Alarm
60% Construction Documents
Designer Confirmation That Science Labs Comply with MSBA Guidelines
NEMetroTech - MSBA 60% CD Submission - Specification Vol 1
NEMetroTech - MSBA 60% CD Submission - Specification Vol 2
NEMetroTech - 60% CD Drawings - [05b] Architectural
NEMetroTech - 60% CD Drawings - [00b] Drawing List (1)
NEMetroTech - 60% CD Drawings - [12] Mechanical
NEMetroTech - 60% CD Drawings - [09] Geo Tech
NEMetroTech - 60% CD Drawings - [11] Fire Protection
NEMetroTech - 60% CD Drawings - [00a]
NEMetroTech - 60% CD Drawings - [01a] Civil Survey
NEMetroTech - 60% CD Drawings - [01b] Civil
NEMetroTech - 60% CD Drawings - [02] Traffic
NEMetroTech - 60% CD Drawings - [03] Landscape
NEMetroTech - 60% CD Drawings - [04] Structure
NEMetroTech - 60% CD Drawings - [05a] Code Analysis
NEMetroTech - 60% CD Drawings - [05c] Architectural Finishes
NEMetroTech - 60% CD Drawings - [05d] Architectural Signage
NEMetroTech - 60% CD Drawings - [06] Equipment
NEMetroTech - 60% CD Drawings - [07] Theatre Equipment
NEMetroTech - 60% CD Drawings - [08] Food Service
NEMetroTech - 60% CD Drawings - [10] Plumbing
NEMetroTech - 60% CD Drawings - [13] Fire Alarm
NEMetroTech - 60% CD Drawings - [14] Electrical
NEMetroTech - 60% CD Drawings - [15] Technology
6B.3.3-02 Utility Company Narrative
6B.3.3-01 Project Approvals Narrative
6B.3.2-03 Comparision Design w Final Educ Program
6B.3.2-01 Updated Space Summary
6B.3.2-02 Space Measurement Analysis
6B.3.2-08 Comparision Design w DESE Chap 74 Spaces
6B.3.2-05 DESE Approved Public Day Education
6B.3.2-06 DESE Approved Chapter 74 Spaces
6B.3.2-04 DESE Approved SPED Spaces
6B.3.2-07 Confirm Scheduled DESE Meeting
6B.3.1-02 Basis of Design Narratives
6B.3.1-03 Building Code Analysis
6B.3.1-05 Interior Color Theory Statement
6B.3.1-06 Structural Load Calculations
6B.3.1-07 Structural Peer Review RFP
6B.3.1-08 Energy Model Calculations
6B.3.1-09 Life Cycle Cost Analysis
6B.3.1-10 HVAC Heat Gain & Loss Calcs
6B.3.1-11 Total Elect Load Calcs
6B.3.1-12 Security & Visual Access
6B.3.1-13 Facility & Maintenance
6B.3.1-14 Quality Control Narratives
6B.2.3-04 Cost Estimate - Designer
2023-01-20 NEMT HS - MSBA VE Tracking Matrix
6B.2.3-06 Description of Early Bid Packages
6B.2.3-05 Updated Project Budget
6B.2.3-02 Cost Estimate Comparison
6B.2.3-01 Cost Estimate Reconciliation
6B.2.1-04 MSBA’s Design Development Review
6B.2.1-02 OPM’s Coordinated Design Review
6B.2.1-01 OPM’s Designer Submission Review
6B.2.1-03 Commissioning Consultants Review
6B.1.1-01 Basic Project Information
NE Metro Tech - MSBA 60% Construction Document Submittal - Binder
90% Construction Documents
6C.2.1-02 OPM’s Coordinated Design Review
6C.2.1-03 Commissioning Consultants Review
6C.2.1-04 MSBA’s 60% CD Review
6C.2.1-05_Confirmation of Designer Evaluation Submittal
6C.2.2-02 District Letter Confirm State & Local Approv
6C.2.3-01_Cost Estimate Reconciliation
6C.2.3-02_Cost Estimate Comparison
6C.2.3-04_Cost Estimate Designer
6C.2.3-05_Updated Project Budget
6C.2.3-08_Pre-qualified Subcontractors
2023-05-22 90% CD NEMT HS - MSBA VE Tracking Matrix
6C.3.1-02 Basis of Design Narratives
6C.3.1-03 Building Code Analysis
6C.3.1-04 Local Green Designations
6C.3.1-07 Color Theory Statement
6C.3.1-08 Updated Structural Calculations
6C.3.1-09 Structural Peer Review
6C.3.1-10 Energy Model Calculations
6C.3.1-11 Life Cycle Cost Analysis
6C.3.1-12 HVAC Heat Gain & Loss Calcs
6C.3.1-13 Total Electrical Load Calcs
6C.3.1-14 Security & Visual Access Requirements
6C.3.1-15 Facility & Maintenance Requirements
6C.3.1-16 Quality Control Narrative
6C.3.2-02 Space Measure Analysis
6C.3.2-03 Comp Current Design w Educ Program
6C.3.2-04 DESE Approv SPED Spaces
6C.3.2-05 DESE Approv Public Day Educ
6C.3.2-06 DESE Approv Chap 74 Spaces
6C.3.2-07 DESE Chap 74 Meeting Summary
6C.3.2-08 Comp Current Design w Approv Chap 74
6C.3.3-01 Project Approvals Narrative
6C.3.3-02 Utility Company Narrative
6C.3.5-03a Early Bid Package - Early Site Preparation
6C.3.5-03b Early Bid Package - Early Structural Bid Package
NEMetroTech - MSBA 90% CD Drawings - [00] Cover Sheets
NEMetroTech - MSBA 90% CD Drawings - [00] Drawing List
NEMetroTech - MSBA 90% CD Drawings - [01a] Survey
NEMetroTech - MSBA 90% CD Drawings - [01b] Civil
NEMetroTech - MSBA 90% CD Drawings - [02a] Landscape
NEMetroTech - MSBA 90% CD Drawings - [02b] Irrigation
NEMetroTech - MSBA 90% CD Drawings - [03] Structural
NEMetroTech - MSBA 90% CD Drawings - [04a] Code Analysis
NEMetroTech - MSBA 90% CD Drawings - [4b] Architectural
NEMetroTech - MSBA 90% CD Drawings - [4c] Architectural Finishes
NEMetroTech - MSBA 90% CD Drawings - [05] Architectural Signage
NEMetroTech - MSBA 90% CD Drawings - [06] Equipment
NEMetroTech - MSBA 90% CD Drawings - [07] Theatre Equipment
NEMetroTech - MSBA 90% CD Drawings - [08] Food Service
NEMetroTech - MSBA 90% CD Drawings - [09] GeoTech
NEMetroTech - MSBA 90% CD Drawings - [10] Plumbing
NEMetroTech - MSBA 90% CD Drawings - [11] Fire Protection
NEMetroTech - MSBA 90% CD Drawings - [12] Mechanical
NEMetroTech - MSBA 90% CD Drawings - [13] Fire Alarm
NEMetroTech - MSBA 90% CD Drawings - [14] Electrical
NEMetroTech - MSBA 90% CD Drawings - [15] Technology
6C.3.6-02 Description of Alternates
NEMetroTech - MSBA 90% CD Submission - Project Manual Vol 1
100% Documents
Preliminary Design Program (PDP)
2020.08.14 NEMT PMA PDP Cover Letter FINAL
3.1.0 - Cover
3.1.0 - Cover Letter - MSBA PDP Submission
3.1.0 - TOC
3.1.1 - Introduction
3.1.1a - Project Directory
3.1.1b - Updated Project Schedule
3.1.2 - Educational Program
3.1.3 - Initial Space Summary
3.1.4a - Evaluation of Existing Conditions
3.1.4b - Space Analysis Plans
3.1.4c - Evidence of Legal Title
3.1.4d - Base Repair - Budget Cost Estimate
3.1.4e - Base Repair - Prelim Arch Scope Diagrams
3.1.5 - Site Development Requirements
3.1.6 - Prelim Eval of Alternatives
3.1.7 - Local Actions & Approval Cert
Appendix A - Modified Space Summary
Appendix B - Cover
Appendix B (a) - Existing Conditions Report - Landscape
Appendix B (b) - Existing Conditions Report - Civil
Appendix B (c) - Existing Conditions Report - Architectural
Appendix B (d) - Existing Conditions Report - Accessibility
Appendix B (e) - Existing Conditions Report - Furniture & Equipment
Appendix B (f) - Existing Conditions Report - Building Code
Appendix B (g) - Existing Conditions Report - Structural
Appendix B (h) - Existing Conditions Report - MEP-FP -
Appendix B (i) - Existing Conditions Report - Technology
Appendix B (j) - Existing Conditions Report - Hazardous Materials
Appendix B (k) - Existing Conditions Report - Traffic Assessment Report
Appendix C - Educational Visioning Report
Appendix D - Phase I Enviro Site Assessment
Appendix E - Wetland Resource Area Anaylsis Report
Appendix F - Statement of Interest
Appendix G - MSBA Board Action Letter
Appendix H - Geotechnical
Appendix I - Cover
Appendix I (a) - Enrollment Certification
Preferred Schematic Report (PSR)
3.3.0 - Cover Letter - MSBA PDP Submission
3.3.0 - Cover
3.3.0 - TOC
3.3.1 - Introduction
3.3.2 - Evaluation of Existing Conditions
3.3.3 - Final Evaluation of Alternatives - Narrative
3.3.3 (a) - Option B.2 Drawings
3.3.3 (b) - Option C.1 Drawings
3.3.3 (c) - Option C.2 Drawings
3.3.3 (d) - Option C.3 Drawings
3.3.3 (e) - Permitting Requirements
3.3.3 (f) - Construction Phasing Diagrams
3.3.3 (g) - Electric Loads
3.3.3 (h) - Gas Loads
3.3.4 - Preferred Solution - Narrative
3.3.4 (a) - Updated Educational Program
3.3.4 (b) - Preferred Solution Space Summary
3.3.4 (c) - Sustainability Documents
3.3.4 (d) - Building Plans
3.3.4 (e) - Site Plan
3.3.4 (f) - Updated Project Schedule
3.3.4 (g) - District's Budget Statement for Preferred Solution
3.3.5 - Local Actions & Approvals
Appendix A - Consultant Narratives - Cover
Appendix A (a) - Consultant Narratives - Landscape
Appendix A (b) - Consultant Narratives - Civil
Appendix A (c) - Consultant Narratives - Architectural
Appendix A (d) - Consultant Narratives - FFE
Appendix A (e) - Consultant Narratives - Structural
Appendix A (f) - Consultant Narratives - MEP-FP
Appendix A (g) - Consultant Narratives - Technology
Appendix A (h) - Consultant Narratives - Traffic
Appendix A (i) - Consultant Narratives - Geotechnical
Appendix B - Cover
Appendix B (a) - Cost Estimate - Arch
Appendix B (b) - Cost Estimate - OPM
Appendix B (c) - Cost Estimate - FFE
Appendix B (d) - Cost Estimate - Technology
Appendix C - Preferred Solution Space Summary
Appendix D - Response to MSBA PDP Review
Appendix E - Education Program w Highlighted Changes
Schematic Design (SD)
Schematic Design Binder
4.1.2-01_Introduction Narrative
4.1.2-01a_MSBA Board of Director's Visual Aids
4.1.2-01b_Response to MSBA PSR Review
4.1.2-02_Final Design Program
4.1.2-02a_Education Space Summary w Narrative
4.1.2-02b_Space Summary Analysis w Designer Cert
4.1.2-02c_Construction Phasing
4.1.2-02d_Fire Department Meeting Minutes
4.1.2-03_Traffic Analysis
4.1.2-04_Enviro & Exist Build Assess
4.1.2-05_Geotechnical Analysis
4.1.2-06_Code Analysis
4.1.2-07_Utility Analysis-Cover
4.1.2-07a_Gas Service
4.1.2-07b_Flow Test
4.1.2-07c_Electrical Service
4.1.2-08_Massing Study
4.1.2-09_Building Systems Narrative - Cover
4.1.2-09a_Civil Narrative
4.1.2-09b_Site Narrative
4.1.2-09c_Architectural Narrative
4.1.2-09d_MEP-FP Narratives
4.1.2-09e_Structural Narrative
4.1.2-09f_FFE Narrative
4.1.2-09g_Technology & Security Narrative
4.1.2-10_Sustainable Design
4.1.2-11_ADA-MAAB Analysis
4.1.2-12_Room Data Sheets
4.1.2-13_Proposed Construction Methodology
4.1.2-14_District Anticipated Reimburse Rate
4.1.2-15_Total Project Budget
4.1.2-15a_Total Project Budget Spreadsheet
4.1.2-15b_Furniture & Equipment Budget
4.1.2-15c_Technology FFE Budget
4.1.2-15d_Estimated Local Share - Tax Impact
4.1.2-16_Cost Estimator - Designer
4.1.2-17_Cost Estimator - CMR
4.1.2-18_Updated Project Work Plan - Cover
4.1.2-18a_Project Directory
4.1.2-18b_Comm-Doc Control Procedure
4.1.2-18c_Designer Work Plan
4.1.2-18d_Project Schedule
4.1.2-19_Local Actions & Approvals
Schematic Design Drawings
NEMetroTech - Schematic Design - [00] Cover
NEMetroTech - Schematic Design - [01] Civil
NEMetroTech - Schematic Design - [02] Traffic
NEMetroTech - Schematic Design - [03] Landscape
NEMetroTech - Schematic Design - [04] Architectural
NEMetroTech - Schematic Design - [05] Equipment
NEMetroTech - Schematic Design - [06] Structural
NEMetroTech - Schematic Design - [07] Fire Protection
NEMetroTech - Schematic Design - [08] Plumbing
NEMetroTech - Schematic Design - [09] Mechanical
Design Development
6A.3.1 General Requirements
6A.3.1-02 Basis of Design Narratives
6A.3.1-03 Building Code Analysis
6A.3.1-05 Interior Color Theory Statement
6A.3.1-07 Structural Load Calculations
6A.3.1-08 Energy Model Calculations
6A.3.1-09 Life Cycle Cost Analysis
6A.3.1-10 HVAC Heat Gain-Loss Calculations
6A.3.1-11 Electrical Load Calculations
6A.3.1-12 Security & Visual Access
6A.3.1-13 Facility Maintenance Requirements
6A.3.5 DD Drawings
6A.3.5 Design Development Drawings
NEMetroTech - DD Drawings - [00] Cover-TOC
NEMetroTech - DD Drawings - [01] Civil
NEMetroTech - DD Drawings - [02] Traffic
NEMetroTech - DD Drawings - [03] Landscape
NEMetroTech - DD Drawings - [04a] Architectural
NEMetroTech - DD Drawings - [04b] Architectural Finishes
NEMetroTech - DD Drawings - [05] Equipment
NEMetroTech - DD Drawings - [06] Theatre
NEMetroTech - DD Drawings - [07] Food Service
NEMetroTech - DD Drawings - [08] Structure
NEMetroTech - DD Drawings - [09] GeoTech
NEMetroTech - DD Drawings - [10] Plumbing
NEMetroTech - DD Drawings - [11] Fire Protection
NEMetroTech - DD Drawings - [12] Mechanical
NEMetroTech - DD Drawings - [13] Lighting
NEMetroTech - DD Drawings - [14] Fire Alarm
60% Construction Documents
Designer Confirmation That Science Labs Comply with MSBA Guidelines
NEMetroTech - MSBA 60% CD Submission - Specification Vol 1
NEMetroTech - MSBA 60% CD Submission - Specification Vol 2
NEMetroTech - 60% CD Drawings - [05b] Architectural
NEMetroTech - 60% CD Drawings - [00b] Drawing List (1)
NEMetroTech - 60% CD Drawings - [12] Mechanical
NEMetroTech - 60% CD Drawings - [09] Geo Tech
NEMetroTech - 60% CD Drawings - [11] Fire Protection
NEMetroTech - 60% CD Drawings - [00a]
NEMetroTech - 60% CD Drawings - [01a] Civil Survey
NEMetroTech - 60% CD Drawings - [01b] Civil
NEMetroTech - 60% CD Drawings - [02] Traffic
NEMetroTech - 60% CD Drawings - [03] Landscape
NEMetroTech - 60% CD Drawings - [04] Structure
NEMetroTech - 60% CD Drawings - [05a] Code Analysis
NEMetroTech - 60% CD Drawings - [05c] Architectural Finishes
NEMetroTech - 60% CD Drawings - [05d] Architectural Signage
NEMetroTech - 60% CD Drawings - [06] Equipment
NEMetroTech - 60% CD Drawings - [07] Theatre Equipment
NEMetroTech - 60% CD Drawings - [08] Food Service
NEMetroTech - 60% CD Drawings - [10] Plumbing
NEMetroTech - 60% CD Drawings - [13] Fire Alarm
NEMetroTech - 60% CD Drawings - [14] Electrical
NEMetroTech - 60% CD Drawings - [15] Technology
6B.3.3-02 Utility Company Narrative
6B.3.3-01 Project Approvals Narrative
6B.3.2-03 Comparision Design w Final Educ Program
6B.3.2-01 Updated Space Summary
6B.3.2-02 Space Measurement Analysis
6B.3.2-08 Comparision Design w DESE Chap 74 Spaces
6B.3.2-05 DESE Approved Public Day Education
6B.3.2-06 DESE Approved Chapter 74 Spaces
6B.3.2-04 DESE Approved SPED Spaces
6B.3.2-07 Confirm Scheduled DESE Meeting
6B.3.1-02 Basis of Design Narratives
6B.3.1-03 Building Code Analysis
6B.3.1-05 Interior Color Theory Statement
6B.3.1-06 Structural Load Calculations
6B.3.1-07 Structural Peer Review RFP
6B.3.1-08 Energy Model Calculations
6B.3.1-09 Life Cycle Cost Analysis
6B.3.1-10 HVAC Heat Gain & Loss Calcs
6B.3.1-11 Total Elect Load Calcs
6B.3.1-12 Security & Visual Access
6B.3.1-13 Facility & Maintenance
6B.3.1-14 Quality Control Narratives
6B.2.3-04 Cost Estimate - Designer
2023-01-20 NEMT HS - MSBA VE Tracking Matrix
6B.2.3-06 Description of Early Bid Packages
6B.2.3-05 Updated Project Budget
6B.2.3-02 Cost Estimate Comparison
6B.2.3-01 Cost Estimate Reconciliation
6B.2.1-04 MSBA’s Design Development Review
6B.2.1-02 OPM’s Coordinated Design Review
6B.2.1-01 OPM’s Designer Submission Review
6B.2.1-03 Commissioning Consultants Review
6B.1.1-01 Basic Project Information
NE Metro Tech - MSBA 60% Construction Document Submittal - Binder
90% Construction Documents
6C.2.1-02 OPM’s Coordinated Design Review
6C.2.1-03 Commissioning Consultants Review
6C.2.1-04 MSBA’s 60% CD Review
6C.2.1-05_Confirmation of Designer Evaluation Submittal
6C.2.2-02 District Letter Confirm State & Local Approv
6C.2.3-01_Cost Estimate Reconciliation
6C.2.3-02_Cost Estimate Comparison
6C.2.3-04_Cost Estimate Designer
6C.2.3-05_Updated Project Budget
6C.2.3-08_Pre-qualified Subcontractors
2023-05-22 90% CD NEMT HS - MSBA VE Tracking Matrix
6C.3.1-02 Basis of Design Narratives
6C.3.1-03 Building Code Analysis
6C.3.1-04 Local Green Designations
6C.3.1-07 Color Theory Statement
6C.3.1-08 Updated Structural Calculations
6C.3.1-09 Structural Peer Review
6C.3.1-10 Energy Model Calculations
6C.3.1-11 Life Cycle Cost Analysis
6C.3.1-12 HVAC Heat Gain & Loss Calcs
6C.3.1-13 Total Electrical Load Calcs
6C.3.1-14 Security & Visual Access Requirements
6C.3.1-15 Facility & Maintenance Requirements
6C.3.1-16 Quality Control Narrative
6C.3.2-02 Space Measure Analysis
6C.3.2-03 Comp Current Design w Educ Program
6C.3.2-04 DESE Approv SPED Spaces
6C.3.2-05 DESE Approv Public Day Educ
6C.3.2-06 DESE Approv Chap 74 Spaces
6C.3.2-07 DESE Chap 74 Meeting Summary
6C.3.2-08 Comp Current Design w Approv Chap 74
6C.3.3-01 Project Approvals Narrative
6C.3.3-02 Utility Company Narrative
6C.3.5-03a Early Bid Package - Early Site Preparation
6C.3.5-03b Early Bid Package - Early Structural Bid Package
NEMetroTech - MSBA 90% CD Drawings - [00] Cover Sheets
NEMetroTech - MSBA 90% CD Drawings - [00] Drawing List
NEMetroTech - MSBA 90% CD Drawings - [01a] Survey
NEMetroTech - MSBA 90% CD Drawings - [01b] Civil
NEMetroTech - MSBA 90% CD Drawings - [02a] Landscape
NEMetroTech - MSBA 90% CD Drawings - [02b] Irrigation
NEMetroTech - MSBA 90% CD Drawings - [03] Structural
NEMetroTech - MSBA 90% CD Drawings - [04a] Code Analysis
NEMetroTech - MSBA 90% CD Drawings - [4b] Architectural
NEMetroTech - MSBA 90% CD Drawings - [4c] Architectural Finishes
NEMetroTech - MSBA 90% CD Drawings - [05] Architectural Signage
NEMetroTech - MSBA 90% CD Drawings - [06] Equipment
NEMetroTech - MSBA 90% CD Drawings - [07] Theatre Equipment
NEMetroTech - MSBA 90% CD Drawings - [08] Food Service
NEMetroTech - MSBA 90% CD Drawings - [09] GeoTech
NEMetroTech - MSBA 90% CD Drawings - [10] Plumbing
NEMetroTech - MSBA 90% CD Drawings - [11] Fire Protection
NEMetroTech - MSBA 90% CD Drawings - [12] Mechanical
NEMetroTech - MSBA 90% CD Drawings - [13] Fire Alarm
NEMetroTech - MSBA 90% CD Drawings - [14] Electrical
NEMetroTech - MSBA 90% CD Drawings - [15] Technology
6C.3.6-02 Description of Alternates
NEMetroTech - MSBA 90% CD Submission - Project Manual Vol 1